Powder coatings emit zero or near zero volatile organic compounds (VOC). Powder coatings can produce much thicker coatings than conventional liquid coatings without running or sagging. Powder coating overspray can be recycled and thus it is possible to achieve nearly 100% use of the coating. Powder coating production lines produce less hazardous waste than conventional liquid coatings. Capital equipment and operating costs for a powder line are generally less than for conventional liquid lines. Powder coated items generally have fewer appearance differences between horizontally coated surfaces and vertically coated surfaces than liquid coated items. A wide range of specialty effects is easily accomplished which would be impossible to achieve with other coating processes.
1,Vantage provides maximum value, flexibility and performance in a powder spray booth for manual powder coating operations and selected automatic operations.
2,Wide range of CFM capacities – 6000, 8000, 10000 and 12000 to meet your specific application requirements Larger CFM capacity single filter/collector modules
3,Reduce initial investment and operating costs
4,Superior design and components for exceptionally quiet operation compared to conventional designs Flexible design accommodates batch or conveyorized operations
5,High-quality manufacturing and factory testing for optimum performance and reliability
6,Polyester filters for superior filtration performance, longer filter life, and minimum powder retention
7,Full-function, compliant control panel with safety interlock comes standard on all models
8,Timed reverse-pulsing of filters for optimum performance and filter life
1. The size of workpiece,especially the max size
2. The max weight of the workpiece
3. Is there any requirements about the suspension of the workpiece?
4. The material of the workpiece
5. The anticipative output for the biggest size of the orkpiece(how many pcs in 8 hours)
6. The length,width and height of the factory available for the powder coating line
7. The heating power:Liquefied Petroleum Gas, Liquefied natural gas,diesel,or electric?
8. Do you need to change colors every day? How many colors do you have in total?
9. Do you need automatic painting or manual painting?
10. Do you need pre-treatment process? If you do,you like spray pre-treatment or bath pre-treatment?
11. The local electricity conditions(_V/_Phase/_Hz)
12. Do you have any special requiremnts about the package?
-Exterior dimensions: 3000*2000*2400mm (L*W*H);
Wall panel and Basement:2mm thickness powder coating color cold rolled steel sheet, nice bending and welding works;
-Voltage/Frequency: 380V/220v(50-60hz);
-Powder Recovery system: 5units of filter cartridge , each filter size: 325*900mm, with 5sets of pulse